Method of producing porous body

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12024610
SERIAL NO

17066063

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method of producing a porous body of a water-insoluble polymer, the method being excellent in terms of simplicity and capable of suppressing formation of a skin layer. A method of producing a porous body of a water-insoluble polymer disclosed here includes the steps of: preparing a solution in which a water-insoluble polymer is dissolved in a mixed solvent containing a good solvent for the water-insoluble polymer and a poor solvent for the water-insoluble polymer; coating the solution on a substrate; coating a slurry containing insulating particles, a binder and a dispersion medium on the coated solution; and simultaneously drying the coated solution and the slurry to porosify the water-insoluble polymer. The poor solvent has a boiling point higher than a boiling point of the good solvent. The dispersion medium can dissolve the water-insoluble polymer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsunobu, Kohei Toyota, JP 19 13
Minakuchi, Akio Okazaki, JP 19 104

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 2, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00