Method for cleaning a polymerisation reactor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12024572
SERIAL NO

17265065

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A polymerization reactor for producing aqueous polymer dispersions by radically initiated emulsion polymerization of one or more ethylenically unsaturated monomers in the presence of one or more protective colloids and/or emulsifiers, is cleaned by initially charging an aqueous mixture comprising one or more ethylenically unsaturated monomers, one or more protective colloids and/or emulsifiers, but no oxidation initiator, the proportion of ethylenically unsaturated monomers being 20 to 70% by weight of the aqueous mixture, heating the aqueous mixture to a temperature of 50° C. to 100° C. for 5 minutes to 3 hours, adding one or more initiators and optionally further starting materials, initiating polymerization, removing the aqueous polymer dispersion thus obtained from the polymerization reactor and post-treating the dispersion to remove wall deposits detached during the process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WACKER CHEMIE AGHANNS-SEIDEL-PLATZ 4 MUNICH 81737

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Braunsperger, Robert Emmerting, DE 13 69
Weitzel, Hans-Peter Reischach, DE 67 384

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 2, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00