Three-dimensionally ordered macroporous oxygen-deficient cerium dioxide catalyst, and preparation method and application thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12023650
APP PUB NO 20220040675A1
SERIAL NO

17311352

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present application is related to a three-dimensionally ordered macroporous oxygen-deficient cerium dioxide catalyst, and a preparation method and an application thereof. The catalyst is prepared by using a polymethyl methacrylate (PMMA) colloidal crystal template method, calcining in a reducing/oxidizing atmosphere, and treating with water vapor, and the prepared catalyst shows an excellent activity and stability in photothermocatalytic purification of typical amospheric pollutants such as styrene, n-hexane, and cyclohexane. The method has the characteristics of cheap and easily available raw materials, simple preparation process, controllable oxygen vacancy, surface acid amount, and acid strength of the obtained material, and excellent photothermocatalytic performance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GUANGDONG UNIVERSITY OF TECHNOLOGYGUANGZHOU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
An, Taicheng Guangdong, CN 12 1
Kong, Jiejing Guangdong, CN 2 0
Li, Guiying Guangdong, CN 42 264

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 2, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00