Multichannel manufacturing device for mass production of microspheres

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12023645
SERIAL NO

17417968

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In the present invention, two adjacent supply lines for supplying two immiscible fluids are spirally disposed on a substrate where microchannels for microsphere production based on a droplet-based highly controlled method for mass-production of microspheres (HCMMM) are formed, and microsphere forming parts each comprising microchannels are arranged between and along the two supply lines, whereby a much larger amount of microspheres can be produced. Further, the two supply lines are disposed in a spiral configuration, and the microsphere forming parts can be disposed by branching microchannels from the two supply lines on inner and outer sides of the spiral configuration, whereby the limited space on a wafer normally having a circular shape can be maximally used to form multiple microsphere forming parts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INVENTAGE LAB INC#101 #601 #612 24 DUNCHON-DAERO 388BEON-GIL JUNGWON-GU SEONGNAM-SI GYEONGGI-DO 13403 13403

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Ju Hee Gyeonggi-do, KR 60 147
Oh, Hyun Suk Seoul, KR 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 2, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00