Blockchain tokenization of aircraft and other complex machinery

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12021997
SERIAL NO

17457791

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of blockchain tokenization of aircraft and other complex machinery includes creating a series of nesting Blockchain Smart Contracts (BSC) or Blockchain Nonfungible Tokens (BNFT) to digitally twin the complete structure of an aircraft or other complex machines, and collect data from the series of nesting BSC or BNFT through the full product life cycle. Each BSC or BNFT represents a part of the aircraft or other complex machine, from an individual part level (Xp) to a component level (Xc) to a subsystem level (Xss) and/or a system level (Xs) to an aircraft or other complex machine level (Xa), in a cascading architecture. The collected data may be used to perform reverse forensics in the case of a part failure or mishap, and/or to track and trace a part of the aircraft or other complex machine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VERITX CORP640 ELLICOTT STREET SUITE 421 BUFFALO NY 14203

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Regenor, James Allen East Aurora, US 11 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00