Ice bin including an ice conveyance and crusher assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12018877
APP PUB NO 20230009119A1
SERIAL NO

17371632

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ice bin for a refrigerator appliance, the ice bin includes a storage body. An auger, rotatably driven by an auger motor, extends within the storage body and has first and second ends. The auger is rotatably driven about a first axis. A first crusher roller is disposed at the second end of the auger and is coupled thereto to rotate together with the auger about the first axis. A second crusher roller is disposed on an axle extending along a second axis, the second crusher roller is freely rotatable about the axle. The second crusher roller is movable between a first position and a second position. When the second crusher roller is in the first position, the first crusher roller and the second crusher roller are spatially arranged and configured to grind the produced ice pieces into crushed ice.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELECTROLUX CONSUMER PRODUCTS INC10200 DAVID TAYLOR DRIVE CHARLOTTE NC 28262

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jackson, Kwashun S Anderson, US 1 0
McCollough, Thomas Anderson, US 23 140
Shi, Zhuochen Clemson, US 22 91

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00