Turbocharger system for a two-stroke engine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12018611
SERIAL NO

17476761

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A turbocharger and method of controlling the same includes a turbine housing comprising an inlet and an outlet, turbine wheel coupled to a shaft. The turbine housing comprising a first scroll and a second scroll for fluidically coupling the inlet and the turbine wheel. The first scroll has a first end adjacent the inlet and a second end adjacent the turbine wheel. The second scroll has a third end adjacent the inlet and a fourth end adjacent the turbine wheel. An exhaust gas diverter valve is coupled to the turbine housing restricting flow into the first scroll or the second scroll.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POLARIS INDUSTRIES INC2100 HIGHWAY 55 MEDINA MN 55340-9770

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Buchwitz, James Roseau, US 1 0
Hanson, Reed Roseau, US 2 2
Hedlund, Darren Roseau, US 1 0
Salfer, Lucas Sabol, US 2 0
Trihey, Sean Roseau, US 1 0
Zimney, Derek Roseau, US 6 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00