Mattress production line

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12017906
APP PUB NO 20230150812A1
SERIAL NO

17773076

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mattress production line for use in mattress production includes at least one adhesion bridge, and at least one assembly unit provided in the vicinity of the adhesion bridge and where the parts, forming the mattress, are joined. The improved mattress production line is that in order to provide transfer of a bending element used in mattress production and of a first component and of a second component, which can essentially be positioned on mutual sides of the bending element, to an assembly unit within a predetermined arrangement; the subject matter mattress production line includes a driving unit having at least one lower conveyor and at least one upper conveyor positioned at the upper vicinity of the lower conveyor, and at least one guidance conveyor configured to feed the element, which forms the mattress, to at least one of the lower conveyor and the upper conveyor in the driving unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELEKTROTEKS ELEKTRONIK TEKSTIL SAN VE TIC LTD STIKAYAPA MAH BEYAZ (530) CAD 20/1 NILUFER BURSA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guler, Orhan Bursa, TR 1 0
Guler, Serkan Bursa, TR 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00