Interlocking modular phase change material system for cargo container

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12017845
APP PUB NO 20230050746A1
SERIAL NO

17784387

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cargo container includes a plurality of panels, a first set of rales, a first pack, and a second pack. The plurality of panels defines a chamber that has an opening configured for loading and unloading of cargo in the chamber. The plurality of panels includes a first panel with the first set of rails connected to the first panel and disposed within the chamber. The first pack and the second pack are slidably received on the first set of rails and each include a phase-change material (PCM) disposed therein. The first pack and the second pack are interlocked with one another such that the first pack and the second pack slide in concert with one another.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ADVANCED COMPOSITE STRUCTURES LLC1026 LEGRAND BOULEVARD CHARLESTON SC 29492

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pherson, Thomas R Daniel Island, US 20 274

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00