Fixture for heat pressing process of manufacturing airbag

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12017417
APP PUB NO 20230141881A1
SERIAL NO

17592093

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fixture for heat pressing process is applied to a hot pressing machine for hot pressing two elastic plastic pieces so as to manufacture an airbag. The two elastic plastic pieces are disposed between the fixture and the hot pressing machine. The fixture includes a first frame, a second frame and a flexible heat blocking layer. The first frame includes two first brackets, which are separated from each other with a first distance. The second frame includes two second brackets, which are separated from each other with a second distance, and located at two ends of the first brackets, respectively. The flexible heat blocking layer is fixed by the first frame and/or the second frame.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL YANG MING CHIAO TUNG UNIVERSITYHSINCHU CITY 300093

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Chi-Li Kaohsiung, TW 2 0
Chuang, Jen-Hui Hsinchu, TW 20 231
Hou, June-Hao Hsinchu, TW 2 0
Lin, Han-Ting Taipei, TW 29 68

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00