Multiple location load control system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12016094
APP PUB NO 20230180359A1
SERIAL NO

18154907

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A load control device may include a semiconductor switch, a control circuit, and first and second terminals adapted to be coupled to a remote device. The load control device may include a first switching circuit coupled to the second terminal, and a second switching circuit coupled between the first terminal and the second terminal. The control circuit may be configured to render the first switching circuit conductive to conduct a charging current from an AC power source to a power supply of the remote device during a first time period of a half-cycle of the AC power source, and further configured to render the first and second switching circuits conductive and non-conductive to communicate with the remote device via the second terminal during a second time period of the half-cycle of the AC power source.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LUTRON TECHNOLOGY COMPANY LLC7200 SUTER ROAD PATENT DEPT COOPERSBURG PA 18036

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lenz, Jonathan T Waltham, US 30 624
Raneri, Daniel Curtis Orefield, US 73 2149
Shukla, Jaykrishna A Mays Landing, US 58 655
Weightman, Russell Abington, US 22 551

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 18, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00