System and method for pre-charging a DC link of a power converter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12015276
APP PUB NO 20230261473A1
SERIAL NO

17673139

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method for pre-charging a DC link of a multi-level power converter, to reduce electrical transients or to decrease a charging current when a converter contactor/disconnect switch is closed, is described. The systems and methods of the present disclosure also provides a new and simplified system for pre-charging a DC link of a multi-level power converter by leveraging a neutral point of a multi-level power converter and a single-line connection to the grid side of the power converter. The DC link charger of the present disclosure, therefore, is capable of reducing the quantity of dedicated superfluous hardware and/or excess resistors, contactors, transformers, fuses, diodes, balancing components, rectifier modules, etc. demanded by conventional systems. Reduced quantities of electronic components and hardware can thereby decrease system costs per unit and lead to significant cost savings.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miller, Zane Taylor Christiansburg, US 5 4
Ramirez, Sanchez Fernando Arturo Salem, US 18 20
Sutherland, Steven Wade Roanoke, US 17 98
Wagoner, Robert Gregory Roanoke, US 164 1463

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 18, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00