DC power supply and distribution system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12015268
SERIAL NO

17440199

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present DC power supply and distribution system includes a plurality of distribution lines provided respectively corresponding to a plurality of loads, a first converter to convert an AC voltage from a commercial AC power source into a plurality of DC voltages and supply the DC voltages respectively to the distribution lines, a second converter to convert a DC power from a power generation and storage source into a plurality of DC powers and supply the DC powers respectively to the distribution lines, and a power controller to control the DC powers such that the efficiency of the first converter is increased, based on information related to the efficiency of the second converter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Higaki, Yusuke Tokyo, JP 22 133
Izumi, Kikuo Tokyo, JP 26 124
Jimichi, Takushi Tokyo, JP 46 238
Kataoka, Takuya Tokyo, JP 41 287
Takuno, Tsuguhiro Tokyo, JP 10 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 18, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00