Concrete vibrator adapter

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12012991
SERIAL NO

18384102

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A concrete vibrator adapter preferably includes an adapter housing, a drive shaft and at least one rotary bearing. The adapter housing preferably includes a bearing bore formed in one end and a shaft hole formed through a bottom of the bearing bore. A ring thread is formed on an outer diameter of the adapter housing at a bore end to threadably receive a threaded retention ring of a vibrator cable. The drive shaft preferably includes a bearing portion, an input portion and an output portion. The bearing portion includes a first bearing diameter, a bearing flange and a second bearing diameter. The first bearing diameter receives a first bearing and the second bearing diameter receives a second bearing. The input portion extends outward from the second bearing diameter. The output portion extends outward from the first bearing diameter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEMCO INDUSTRIAL LLC (TX)1801 INDUSTRIAL BLVD BRENHAM TX 77833

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blaylock, Bryan C Fremont, US 3 0
Leber, Josh L Fremont, US 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 18, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00