Sub-surface post remover

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12012774
APP PUB NO 20230220700A1
SERIAL NO

17571608

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sub-surface pole and pole foundation remover having a portable frame, a cylinder mounted on the frame and configured to receive pressurized fluid, a lifting piston slidably mounted in the cylinder, a grapnel connected to the lifting piston and having a plurality of lower arms that extend from a bottom circular support and that are configured to grip a sub-surface pole located below ground, and a control lever configured to direct the pressurized fluid to the cylinder that is actuated to cause the lifting piston to extend and push the grapnel upward relative to the portable frame to remove the pole from the ground. The grapnel may have a top circular support and a middle circular support connected to the top circular support by a plurality of flexible cables. A cinching cable may be used to grip the pole, the grapnel may have gripping teeth and fluid may be hydraulic.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAVIS RANDY EDWARDSPRING TX

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Davis, Jeffrey Randall Spring, US 2 1
Davis, Randy Edward Spring, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 18, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00