Tubular structural member for exterior of construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12012719
APP PUB NO 20220396930A1
SERIAL NO

17284384

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To provide a pipe member being able to reduce the vibration applied and improve its durability. A pipe member to be installed on the body of a construction machine has an outer main pipe and an inner auxiliary pipe inserted into the outer main pipe. An outer diameter of the inner auxiliary pipe is formed smaller than an inner diameter of the outer main pipe. The inner auxiliary pipe has a securing part secured on the outer main pipe and at least one of end parts of the inner auxiliary pipe is a free end without being secured on the outer main pipe.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CATERPILLAR SARLROUTE DE FRONTENEX 76 GENEVA 1208

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishizuka, Hidetaka Akashi, JP 2 0
Matsumura, Kazumasa Akashi, JP 11 9
Okada, Naoya Akashi, JP 78 738
Tadasu, Takafumi Akashi, JP 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 18, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00