Electrolytic generators

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12012661
SERIAL NO

16914299

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In accordance with the principals of the present invention, an electrolytic generator and method of electrolytic generation are provided. An electrolytic stack includes of a first electrode, a second electrode, and a polymer-electrolyte membrane placed between the first and second electrodes. A first fluid passage provides fluid passage over the first electrode while a second fluid passage provides fluid passage over the second electrode. A third fluid passage provides fluid connection between the first fluid passage and the second fluid passage such that the fluid flows from the first fluid passage to the second fluid passage via the third fluid passage. An electronic current is provided between the first electrode and the second electrode when a voltage bias is applied to the electrodes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AQUAMOX INCCHICAGO IL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ceres, Donato M Chicago, US 9 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 18, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00