Decomposition processor and decomposition processor mounted vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12011629
APP PUB NO 20210308512A1
SERIAL NO

17351552

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In order to attain an efficient decomposition process by water plasma, a decomposition processor includes a water plasma generator which is configured to inject water plasma, from the injection port, by arc discharge generated between negative and positive electrodes; and a supply device configured to supply a decomposition target object to a water plasma jet stream injected from the water plasma generator, wherein the decomposition target object is decomposed by the water plasma. The supply device has a nozzle for providing the decomposition target object from a tip, and the negative electrode, the injection port, the positive electrode and the nozzle are arranged in that order along the center axis line of the injection port. The tip of the nozzle is placed inside of the water plasma jet stream.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HELIX CO LTD5-20-11 ISHIKAWA FUJISAWA-SHI KANAGAWA 2520815 ?2520815

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Watanabe, Takayuki Fukuoka, JP 316 3383
Yaguchi, Hirofumi Kanagawa, JP 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 18, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00