High-throughput multiplexed recording

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12009785
SERIAL NO

17413518

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In some embodiments, there is provided an apparatus including a common bus and a plurality of oscillatrode circuits coupled to the common bus, the plurality of oscillatrode circuits including a first oscillatrode circuit outputting a first frequency tone when a first input voltage is detected by the first oscillatrode circuit and a second oscillatrode circuit outputting a second frequency tone when a second input voltage is detected by the second oscillatrode circuit, wherein common bus carries the first frequency tone and the second frequency tone at different frequencies in a frequency division multiplex signal. Related systems, methods, and articles of manufacture are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOARD OF TRUSTEES FOR THE LELAND STANFORD JUNIOR UNIVERSITYBUILDING 170 THIRD FLOOR MAIN QUAD P O BOX 20386 STANFORD CA 94305-2038

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arbabian, Mohammad Amin Stanford, US 28 220
Chien, Jun-Chau Palo Alto, US 8 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 11, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 11, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 11, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00