Method and apparatus for protecting an electrical load

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12009765
SERIAL NO

17432175

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A load protection apparatus for protecting an electrical load connected to an output terminal of the load protection apparatus against overcurrent, includes an overcurrent protection circuit having a power switch through which the electrical load receives an electrical load current via the output terminal and having a sensor component connected in series with the power switch. The sensor component is adapted to directly generate a voltage drop corresponding to the current rise speed of the electrical load current flowing from an input terminal of the load control apparatus, via the sensor component and the power switch to the output terminal. The sensor component further includes a driver circuit adapted to detect an occurring overcurrent depending on the voltage drop generated by the sensor component and depending on a voltage drop along the power switch adapted to switch off said power switch upon detection of an overcurrent within a switch-off period.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUTURE SYSTEMS BESITZ GMBHRÖDENTAL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Först, Bernhard Kronach, DE 7 3
Zimmermann, Christian Erlangen, DE 36 123

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 11, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 11, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 11, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00