Kapok fibre spinning process

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12006596
SERIAL NO

17296799

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a process for obtaining a spinnable and/or needlable Kapok fibre fraction, and/or Kapok fibre blend with one or more other fibres in a range of from 100% to 10% by weight, comprising the steps of: •a. sorting the longest and cleanest fibres for spinning, by subjecting the fibres to an air stream directed towards a deposition area with a sorting wall, whereby a longer fibre fraction is collected behind the sorting wall, to obtain a short staple Kapok fibre base having an average length of from 10 to 20 mm; •b. adjusting the average moisture content of the kapok fibre base to an average measured moisture content in the range of from 8% to 12% moisture, to obtain moisture- and length-adjusted Kapok fibres, and, optionally •c. blending the moisture-and length-adjusted Kapok fibres with the second fibre base, to obtain a Kapok-comprising fibre blend.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FLOCUS B V7524 RJ ENSCHEDE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Muijsers, Jeroen J Enschede, NL 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 11, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 11, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 11, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00