Enamel composition, method for preparing enamel composition, and cooking appliance

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12006257
APP PUB NO 20200270168A1
SERIAL NO

16795959

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An enamel composition, a method for preparing an enamel composition, and a cooking appliance are provided. The enamel composition may include 15 to 50 wt % of silicon dioxide (SiO2); 1 to 10 wt % of boron oxide (B2O3); 10 to 20 wt % of at least one of lithium oxide (Li2O), sodium oxide (Na2O), or potassium oxide (K2O); 1 to 5 wt % of sodium fluoride (NaF); 1 to 10 wt % of zinc oxide (ZnO); and 20 to 50 wt % of at least one of titanium dioxide (TiO2), molybdenum oxide (MoO3), bismuth oxide (Bi2O3), cerium dioxide (CeO2), manganese dioxide (MnO2), or Iron oxide (Fe2O3), which provides an enamel composition with a reduced cleaning time, and facilitates cleaning without soaking in water.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG ELECTRONICS INCSEOUL SOUTH KEREAN SEOUL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Suyeon Seoul, KR 13 57
Kim, Young Seok Seoul, KR 196 612

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 11, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 11, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 11, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00