Methods and systems for processing glass and methods for reinforcing glass products

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12006243
SERIAL NO

16467952

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mixture including glass fragments is located in a containment vessel and is processed in a kiln to form a commercially useful building product. The mixture is initially heated over a first time period to a first temperature intermediate the glass transition point temperature and about 950° C. or 1,100° C. (Section A). At the first temperature the glass fragments slump and bond to each other and the mixture is soaked at this temperature for a second time period (Section B). After reducing the temperature (Section C), the mixture is annealed for another time period (Section D). Finally, the kiln is cooled to allow the mixture to be removed (Section E).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LCRT PTY LTDROCKDALE NSW 2216

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maher, Michael Vincent Wagga Wagga, AU 3 29
White, Graeme Lindsay Wagga Wagga, AU 1 1
Willis, Gregory David Wollongong, AU 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 11, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 11, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 11, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00