Movable magnet bicycle pedal, and shoe coupling device equipped with means for preventing attachment of metal powder

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12005993
SERIAL NO

17298586

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a movable magnet type bicycle pedal, and a shoe coupling device equipped with a means for preventing attachment of metal powder. More particularly, the present invention relates to a movable magnet type bicycle pedal and a shoe coupling device equipped with a means for preventing attachment of metal powder, wherein the shoe coupling device and the pedal are respectively provided with a magnet, and are coupled to each other by magnetic force only during pedaling, and, when the pedaling is stopped or the running of a bicycle is stopped, the coupling between the magnets is released through a magnetic separation means and at the same time metal powder attached to a shoe is caused to fall so as to prevent the metal powder from being attached to the shoe.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KIM DO YOUNGSEOUL 04775

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Do Young Seoul, KR 166 1801
Kim, Ji Heon Seoul, KR 9 19
Kim, Ji Seong Seoul, KR 25 44
Yoon, Kyeong Sook Seoul, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 11, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 11, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 11, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00