Bidirectional energy transfer systems and methods for providing aggregated power outage mapping

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12005790
APP PUB NO 20230043446A1
SERIAL NO

17392737

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods may coordinate and provide bidirectional energy transfer events between electrified vehicles and other vehicles, devices, and/or structures. A power outage map can automatically be generated in response to a power outage condition of a grid power source. Both a power outage zone and a predicted power outage zone may be identified within the power outage map. A notification, alternative drive route recommendation, etc. may be sent to users of the bidirectional energy transfer system who are operating their vehicles near the power outage zone or the predicted power outage zone.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORD GLOBAL TECHNOLOGIES LLCFAIRLANE PLAZA SOUTH SUITE 800 330 TOWN CENTER DRIVE DEARBORN MI 48126

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Howard-Cone, Katherine Canton, US 34 29
O'Gorman, Ryan Beverly Hills, US 60 49
Phung, Peter Windsor, CA 64 51
Salter, Stuart C White Lake, US 1041 6210

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 11, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 11, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 11, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00