Optical system including light control film and fresnel lens

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12004410
APP PUB NO 20240122043A1
SERIAL NO

17768421

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical system includes a light source, an optical film curved about a first axis, and a light control film curved about the first axis and disposed between the light source and the optical film. The optical film includes a microstructured first major surface and an opposing second major surface. The microstructured first major surface defines a linear Fresnel lens including a plurality of Fresnel elements extending longitudinally along the first axis. The first major surface of the optical film faces the light control film. The light control film includes a plurality of alternating optically transmissive and optically absorptive regions extending longitudinally along the first axis such that in a cross-section orthogonal to the first axis, for at least a majority of the optically transmissive regions, a centerline between adjacent optically absorptive regions is substantially normal to a major surface of the light control film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
3M INNOVATIVE PROPERTIES COMPANYP O BOX 33427 ST PAUL MN 55133-3427

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Owen M Minneapolis, US 21 20
Boyd, Gary T Woodbury, US 96 2057
Fan, Shu-Ching Woodbury, US 7 2
Hao, Encai Woodbury, US 79 1058
Liu, Tao Woodbury, US 613 3850
Nelson, Caleb T McKinney, US 48 34
Pham, Tri D Woodbury, US 52 252
Schmidt, Daniel J Woodbury, US 57 641

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 4, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00