Optical film and method of manufacturing the same, reflective liquid crystal display panel and display apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12001094
APP PUB NO 20220382102A1
SERIAL NO

17605520

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical film includes a polarizer. The polarizer includes a base layer, and a material of the base layer is obtained by dyeing a base material with a dye. The base material includes a polyvinyl alcohol material, and the dye is selected from blue dichroism organic dyes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOE TECHNOLOGY GROUP CO LTD100015 NO 10 JIUXIANQIAO ROAD BEIJING CHAOYANG DISTRICT BEIJING CITY BEIJING CITY 100015
BEIJING BOE OPTOELECTRONICS TECHNOLOGY CO LTDNO 8 XIHUANZHONGLU BDA BEIJING 100176

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bi, Yao Beijing, CN 39 17
Cheng, Zhangxiang Beijing, CN 12 9
Wang, Ce Beijing, CN 133 1757
Wang, Jiaxing Beijing, CN 54 28
Wu, Xiaojuan Beijing, CN 89 83
Yuan, Hongliang Beijing, CN 61 89
Zhang, Donghua Beijing, CN 16 33
Zhao, Zhiqiang Beijing, CN 142 405
Zheng, Qi Beijing, CN 97 546
Zhong, Xuan Beijing, CN 46 148

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 4, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00