Pressure referenced valve

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12000495
SERIAL NO

17380573

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A referenced pressure valve for a fluid system having a housing including: an inner wall enclosing a cavity providing fluid communication between the inlet and the outlet; a rim in the cavity defining a bypass passage circumscribed outwardly by the inner wall and inwardly by the rim, an upstream passage located between an upstream end of the cavity and the rim, and a downstream passage located between the rim and a downstream end of the cavity. A rib extends outwardly from the rim to the inner wall through the bypass passage, and a piston assembly, received within a chamber circumscribed outwardly by the rim, includes a piston movable relative to the rim between a position in which the piston obstructs the flow path at the upstream passage and a position in which the piston is at least partially clear of the path to permit flow along the path.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRATT & WHITNEY CANADA CORP1000 MARIE VICTORIN BLVD LONGUEUIL QU J4G 1A1

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pellerin, Hugues Montréal, CA 7 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 4, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00