Electronically controlled limited-slip differential

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12000469
SERIAL NO

18531866

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A differential is provided with: a torque receiving casing; a differential gear set having first and second side gears to differentially distribute torque to the first and second side gears; a clutch interposed between the casing and the first side gear and configured to exert a frictional braking force on the first side gear against the casing to limit a differential motion between the first side gear and the second side gear; an actuator configured to apply a pressing force to the clutch to control the differential motion; and an electronic control unit configured to calculate a demand torque value from the input torque, compare the wheel load with a threshold value to determine a correction value, make a correction in the demand torque value by the correction value to obtain a demand value, and control an electric power supplied to the actuator in response to the demand value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GKN AUTOMOTIVE LIMITED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoshino, Masato Tochigi, JP 15 83
Nagaoka, Takahiro Tochigi, JP 47 635
Saito, Ryuya Tochigi, JP 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 4, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00