Frack valve greasing system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12000240
SERIAL NO

17117386

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A greasing system may be placed partially within the red zone and partially outside of the red zone. Grease and pneumatic power is supplied from outside of the red zone to a pod, inside of the red zone, having local storage, high-pressure pumping capacity, and a distribution mechanism. The grease is supplied from outside of the red zone to the pod at low-pressure through a hose having at least a 1 inch inside diameter and is usually at least 100 feet long. The pod pressurizes the grease to a high-pressure and distributes the grease via a distribution mechanism to a relatively short hose, generally less than 8 feet between the distribution mechanism and the greasing point on the wellhead, in order to minimize pressure losses.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PATRIOT RESEARCH CENTER LLC (DBA ATLAS PRESSURE CONTROL)9575 KATY FREEWAY SUITE 490 HOUSTON TX 77024

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Agarwal, Manish Cypress, US 58 329
Cain, Brandon Houston, US 15 46
Opitz, Joseph Wellington, US 4 5
Pursley, Michael Woodlands, US 2 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 4, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00