Mixture and method for fire suppression and prevention

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11999894
SERIAL NO

17856725

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for creating a mixture for fire prevention and suppression, comprising introducing phosphoric acid and anhydrous ammonia gas into a reactor, then introducing urea into the reactor in a controlled rate to achieve a pH of the mixture is 7+/−0.1. Next amino functionalized siloxane is introduced into the mixture, and then powdered volcanic ash (pumice) is introduced. The powdered volcanic ash is introduced into the mixture by means of a turbo-shear high performance mixer. The resulting URAP can be sprayed as fire prevention coating onto vegetation, structural buildings, lumber material and/or other combustible structures. The URAP mixture performs as a fire suppressant by coating substrates and starving combustion's necessary oxygen access.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOMODO FIRE SYSTEMS INC700 JARVIS DRIVE MORGAN HILL CA 95037

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Garza, Juan Morgan Hill, US 4 10
Sahbari, Javad Morgan Hill, US 2 0
Sahbari, Shawn Morgan Hill, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 4, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00