Coupling support for a central buffer coupling of a rail vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11999389
APP PUB NO 20210323587A1
SERIAL NO

17264926

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A coupling support for a central buffer coupling of a rail vehicle includes first and second holding plates to be secured to the body of the rail vehicle. The coupling support has a base plate and a transverse bar disposed between the holding plates. The transverse bar is resiliently coupled to the base plate and is disposed above the base plate. First and second pivot levers are disposed on the base plate such that the pivot location of each pivot lever is disposed below the transverse bar, and the pivot locations are connected to the base plate. Each upper portion of the pivot levers is connected to the transverse bar by an articulated connection such that a movement of the transverse bar away from the base plate is restricted by the articulated connections and a movement of the transverse bar towards the base is allowed by the articulated connections.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS MOBILITY GMBHOTTO-HAHN-RING 6 81739 MÜNCHEN 81739

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kroiss, Manuel Ebersbach, DE 10 12
Peer, Hannes Munich, DE 11 8
Trachtenherz, Alexander Munich, DE 5 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 4, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00