Manufacturing method of semiconductor device including field-effect transistor comprising buried oxide (BOX) film and silicon layer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11996448
APP PUB NO 20230253456A1
SERIAL NO

18135426

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Occurrence of short-channel characteristics and parasitic capacitance of a MOSFET on a SOI substrate is prevented. A sidewall having a stacked structure obtained by sequentially stacking a silicon oxide film and a nitride film is formed on a side wall of a gate electrode on the SOI substrate. Subsequently, after an epitaxial layer is formed beside the gate electrode, and then, the nitride film is removed. Then, an impurity is implanted into an upper surface of the semiconductor substrate with using the gate electrode and the epitaxial layer as a mask, so that a halo region is formed in only a region of the upper surface of the semiconductor substrate which is right below a vicinity of both ends of the gate electrode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RENESAS ELECTRONICS CORPORATIONTOKYO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwamatsu, Toshiaki Tokyo, JP 222 3449
Makiyama, Hideki Tokyo, JP 43 201
Tsunomura, Takaaki Tokyo, JP 34 133
Yamamoto, Yoshiki Tokyo, JP 80 349

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00