Converter control method, converter, and photovoltaic power generation system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11994893
SERIAL NO

17696596

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This application relates to a converter in a photovoltaic power generation system and a converter control method. An input end of the converter is connected to at least one photovoltaic module, and an output end is connected to an inverter. The control method includes: determining an output power-voltage (PV) curve of a converter based on an output PV curve of the photovoltaic module; and controlling a voltage output of the converter based on the output PV curve of the converter. The output PV curve includes at least a simulated voltage limiting section and a constant power section that are connected. In this application, an existing MPPT control policy of the inverter can be adapted when a voltage-limited output is implemented, to avoid a case in which a power of a photovoltaic string drops to zero.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUAWEI DIGITAL POWER TECHNOLOGIES CO LTDSHENZHEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gu, Guilei Shanghai, CN 20 11
Wang, Yu Xi'an, CN 1481 8143
Xu, Zhiwu Shanghai, CN 28 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00