Solenoid valve

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11994230
SERIAL NO

17569234

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solenoid valve includes a valve portion and a solenoid portion. The valve portion has a sleeve and a valve body inserted into the sleeve. The solenoid portion includes a stator core having a magnetic attraction core, a sliding core, a magnetic flux passage suppressing portion that suppresses the passage of magnetic flux between the sliding core and the magnetic attraction core, a magnetic yoke, a coil portion, a plunger, and a magnetic tubular base portion. The base portion is fastened to a first outer peripheral surface of an end on the solenoid portion side in the axial direction of the sleeve, is arranged outside a radial direction of a second outer peripheral surface of the end on the valve portion side in the axial direction of the magnetic attraction core, and comes into contact with the yoke inside the yoke.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATIONKARIYA-CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arai, Masato Kariya, JP 43 1130
Kondou, Shinichi Kariya, JP 7 14
Sasao, Kazuhiro Kariya, JP 27 373

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00