Metal product, method for manufacturing the metal product, and metal composite

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11993863
SERIAL NO

17484259

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A metal product includes a metal substrate, at least one first hole, at least one second hole, and at least one third hole. The first hole is formed in a surface of the metal substrate. The second hole is formed in at least one of a portion of the surface of the metal substrate without the first hole and an inner surface defining the first hole. The third hole is formed in at least one of a portion of the surface of the metal substrate without the first hole and without the second hole, a portion of the inner surface defining the first hole without the second hole, and an inner surface defining the second hole. The first, second, and third holes enhance a bonding strength between the metal product and a material product. The disclosure also provides a metal composite and a method for manufacturing the metal product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FULIAN YUZHAN PRECISION TECHNOLOGY CO LTDFOXCONN HONGGUAN SCIENCE PARK DASAN COMMUNITY GUANLAN STREET LONGHUA DISTRICT SHENZHEN CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hon, Kar-Wai New Taipei, TW 10 7
Hu, Yu-Mei Shenzhen, CN 1 0
Mai, Zhong-Hua Shenzhen, CN 1 0
Qin, An-Li New Taipei, TW 2 0
Shen, Li-Ming Shenzhen, CN 6 20
Wang, Qing-Rui Shenzhen, CN 1 0
Wang, Zheng-Quan Shenzhen, CN 2 0
Xue, Shi-Chu Shenzhen, CN 1 0
Yang, Ching-Hao New Taipei, TW 2 0
Zhang, Dong-Xu Shenzhen, CN 2 0
Zhou, Hao Shenzhen, CN 295 2054

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00