Aqueous formulation that reduces damage caused by spring frosts in plants and production method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11992007
APP PUB NO 20220312760A1
SERIAL NO

17632152

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An aqueous formulation that reduces the damage caused by spring frosts in plants having: (a) 0.001-2% by weight PVA micro/nanoparticles having a molecular weight of 10,000-100,000 g/mol and 1-20% acetate groups; (b) 0.0001-0.4% by weight stabilising agents; (c) 0.0005-0.05% by weight category IV adjuvants; (d) 0.00025-4% by weight emulsifier; (e) 0.003-6% by weight sodium hydroxide; and (f) 0.0065-13% by weight hydrochloric acid at 37% weight/weight and 1.18 g/mL density; a process for producing the aqueous formulation, and to uses.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSIDAD DE CONCEPCIONBARRIO UNIVERSITARIO S/N EDIFICIO EMPREUDEC CONCEPCIÓN
CENTRO DE INVESTIGACIÓN DE POLIMEROS AVANZADOSAVENIDA COLLAO 1202 EDIFICIO DE LABORATORIO CIPA CONCEPCION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bastias, Ibarra Richard Mauricio Concepcion, CL 2 0
Ide, Walther Concepcion, CL 1 0
Rodriguez, Llamazares Saddys María Concepcion, CL 1 0
Sabando, Correa Constanza Concepcion, CL 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00