System and method for preparing nir sample on baler

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11991956
APP PUB NO 20210204482A1
SERIAL NO

17138614

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A baler includes a near-infrared testing system configured to receive near-infrared radiation reflected by plant material in a bale and to analyze the near-infrared radiation and generate evaluation data reflecting one or more properties of the plant material. The near-infrared testing system is calibrated using a calibration sample at a calibration temperature. A temperature sensor measures a sample temperature of a crop sample of the plant material and a temperature alteration mechanism adjusts the sample temperature of the crop sample so that the sample temperature matches the calibration temperature of the calibration sample before the near-infrared testing system receives the near-infrared radiation reflected by the plant material. A computer receives and combine the evaluation data of the plant material to produce overall evaluation data reflecting one or more overall properties for the at least one bale of the plurality of bales, and assign the overall evaluation data to the bale.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AGCO CORPORATION4205 RIVER GREEN PARKWAY DULUTH GA 30096-2568

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hamilton, Kevin J Newton, US 40 122
Kendrick, Patrick Hesston, US 41 235

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00