Interlock device configured to open or close the through hole lever input portion of an automatic transfer switch
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
May 21, 2024
Grant Date -
Jul 28, 2022
app pub date -
Oct 17, 2021
filing date -
Jan 28, 2021
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
An interlock structure of a bypass transfer switching device is proposed. When supply power is bypassed through a bypass switch, the interlock structure may prevent manual switching on an automatic transfer switch, and allow the automatic transfer switch to be input into a switchboard when power input directions of the bypass switch and the automatic transfer switch match with each other. The interlock structure includes: the automatic transfer switch having a lever input portion for manual switching of a normal supply and an alternative supply; the bypass switch configured to bypass electric power of the normal supply or the alternative supply supplied to a load side through the automatic transfer switch; and an interlock device configured to automatically close the lever input portion when the bypass lever is operated.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
O-SUNG ELECTRIC MACHINERY CO LTD | 136 HANTAEMAL-GIL WOLLONG-MYEON PAJU-SI GYEONGGI-DO 10945 |
International Classification(s)

- 2021 Application Filing Year
- H02B Class
- 240 Applications Filed
- 135 Patents Issued To-Date
- 56.25 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Hwang, Shin-o | Paju-si, KR | 2 | 1 |
# of filed Patents : 2 Total Citations : 1 | |||
Moon, Sunghwan | Seoul, KR | 12 | 20 |
# of filed Patents : 12 Total Citations : 20 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H02B Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Nov 21, 2027 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Nov 21, 2031 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Nov 21, 2035 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
Date | Code | Event | Description |
---|---|---|---|
May 21, 2024 | P | Publication | |
May 01, 2024 | STCF | INFORMATION ON STATUS: PATENT GRANT | free format text: PATENTED CASE |
Apr 19, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
Jan 23, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
Jan 19, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: AWAITING TC RESP., ISSUE FEE NOT PAID |
Dec 27, 2023 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
Sep 22, 2023 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
Jul 28, 2022 | P | Published | |
Nov 22, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
Oct 18, 2021 | FEPP | FEE PAYMENT PROCEDURE | free format text: ENTITY STATUS SET TO SMALL (ORIGINAL EVENT CODE: SMAL); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY |
Oct 17, 2021 | F | Filing | |
Oct 17, 2021 | FEPP | FEE PAYMENT PROCEDURE | free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY |
Oct 05, 2021 | AS | ASSIGNMENT | free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:MOON, SUNGHWAN;HWANG, SHIN-O;REEL/FRAME:057811/0776 Owner name: O-SUNG ELECTRIC MACHINERY CO., LTD., KOREA, REPUBLIC OF Effective Date: Oct 05, 2021 |
Jan 28, 2021 | PD | Priority Date |

Matter Detail

Renewals Detail
