Water meter powered by energy produced from fluid flow pressure changes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11988538
APP PUB NO 20240060808A1
SERIAL NO

18364988

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A water meter reading device having a piston (503) or a membrane (527) that moves with the pressure changes of the water pipe (301, 501, 601) network is disclosed. The movement charges a capacitor (704) with electric energy released for reading the water meter. This makes it possible to realize the system without a battery, as the electricity needed for reading the water meter, and communicating the water meter reading to the water company, is used at the same moment that the electricity is generated. This also has the consequence that the water meter readings occur at the same time as the pressure changes in the water pipe (301, 501, 601) network.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IDEAVIPU OYVAPAAMUURARINKUJA 1 A HELSINKI 00570

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pukari, Mika Helsinki, FI 29 302

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00