Combustion apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11988383
APP PUB NO 20220333773A1
SERIAL NO

17703707

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustion chamber inside a combustion box has disposed therein a burner positioning frame having: a rear frame part positioned on a rear side of a burner-disposed portion; and a burner positioning frame having side frame part positioned on each laterally outside of the burner-disposed portion. The rear frame part has formed therein a laterally elongated drawn part which is dented rearward. The secondary air flowing from the distribution holes positioned in such a portion of the partition plate as is closer to the rear end of the partition plate is restrained by the drawn part from flowing upward from between the partition plate and a lower edge of the rear frame part through a clearance between the rear frame part and a rear plate part of the combustion box.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RINNAI CORPORATION2-26 FUKUZUMI-CHO NAKAGAWA-KU NAGOYA-SHI 454-0802

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nagahama, Chihiro Aichi, JP 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00