Crank quick-connection structure, pedal assembly, and bicycle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11987319
APP PUB NO 20230415843A1
SERIAL NO

18100368

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A crank quick-connection structure is used for connecting a crank with a main shaft, and includes an adapter and a connecting assembly. The adapter is connected to the main shaft, one end of the crank is provided with a cooperating cavity extending in a thickness direction thereof, and the adapter penetrates the cooperating cavity from one end of the cooperating cavity. The connecting assembly is connected to the adapter, and the connecting assembly has a locking position and a releasing position. In the locking position, the crank cooperates with the connecting assembly so that the cooperating cavity and the adapter are locked and connected; and in the releasing position, the crank is disengaged from the connecting assembly so that the crank can be disengaged from the adapter in an axial direction of the adapter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROYALBABY CYCLE BEIJING CO LTDBEIJING 100089

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chao, Zhiwei Beijing, CN 4 0
Hua, Aicheng Beijing, CN 1 0
Tong, Lixin Beijing, CN 6 35
Wang, Yixiong Beijing, CN 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00