Front structure of vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11981371
APP PUB NO 20220315124A1
SERIAL NO

17706601

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A front structure of a vehicle includes a drain provided below a cowl grille, the drain forming a closed cross-section extending in the vehicle width direction in cooperation with the cowl grille, and a gutter, provided in the closed cross-section above the drain, that receives the water dripping from a front windshield, in which the gutter member has a drain portion that drains the water to the drain, the drain has a top deck portion thereon at a position at which the drain overlaps with an outside air introduction hole in plan view, and the drain portion is provided at substantially the same position as the top deck portion in the vehicle width direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAZDA MOTOR CORPORATION3-1 SHINCHI FUCHU-CHO AKI-GUN HIROSHIMA 730-8670

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mogi, Hosei Hiroshima, JP 4 3
Sasaki, Michiaki Hiroshima, JP 29 437

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00