Method for the production of solid molded articles made of non-wood plant materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11981048
APP PUB NO 20220274283A1
SERIAL NO

17633183

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a method for the production of a solid molded article comprising non-wood plant material, the method comprising the steps of (a) providing one or more fresh non-wood plant materials having a moisture content from 20% w/w to 99 w/w; (b) heating the fresh non-wood plant material at a temperature from 40° C. to 250° C., in particular, at a temperature from 60° C. to 140° C., and a pressure from 40 KPa to 750 KPa, in particular, for at least 0.5 h, maintaining the moisture content of the material equal to or higher than 20% w/w; (c) molding the heated material obtained in step (b); and (d) drying the molded material obtained in step (c). The invention also provides solid molded articles obtainable by the method of the invention.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FELTWOOD ECOMATERIALES S L50018 ZARAGOZA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bernués, Del Río Emiliano Saragossa, ES 1 0
Diez, Ferrer José Luis Saragossa, ES 1 0
Yáñez-Barnuevo, Malo Aránzazu Saragossa, ES 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00