Shot-processing device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11980999
APP PUB NO 20200282518A1
SERIAL NO

16647866

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A shot-processing device is provided, and by it they are effectively reused and prevented from being taken out of a cabinet and from scattering. A structure (40) for a flow path that connects the inside of the cabinet (12) and a suction port (70A) of a dust collector (70) includes a part of a route for circulation of a circulating machine (32) and a second flow path (40Y) that connects a chamber for blowing air and the suction port (70A). In the structure for the flow path a classifying part (35) is provided. It includes a first cyclone (36) that classifies particulate objects that include shots as shots that have a diameter that makes them reusable and as the other particulate objects and includes a part of the first flow path (40X), and a second cyclone (44) that includes a part of the second flow path.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SINTOKOGIO LTD28-12 MEIEKI 3-CHOME NAKAMURA-KU NAGOYA-SHI AICHI 4506424

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sugaya, Takanori Aichi, JP 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00