Solder device and system controller thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11980960
APP PUB NO 20230201944A1
SERIAL NO

18117544

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system controller includes a light source, an optical guiding assembly, a sensor and a feedback controller, and is applied to perform a solder operation with a solder module. The light source emits waveband light guided to a to-be-soldered area for heating. The optical guiding assembly is disposed between the light source and the solder module, and the waveband light is guided to the solder module by the optical guiding assembly. The sensor is disposed on another side of the optical guiding assembly for receiving a sensing light beam and then generating a sensing signal. The sensing light beam is guided to the sensor by the optical guiding assembly. The feedback controller is connected with the sensor and the light source for receiving the sensing signal and then controlling the light source. The system controller is a static part, and the solder module is a dynamic part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DELTA ELECTRONICS INCNO 16 TUNGYUAN ROAD CHUNGLI INDUSTRIAL ZONE TAOYUAN CITY 320023

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Hung-Wen Taoyuan, TW 58 140
Ding, Ren-Feng Taoyuan, TW 7 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00