Pole switching in multi-phase machines

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11979103
APP PUB NO 20230179134A1
SERIAL NO

17915450

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and system of performing a pole switching operation in a multi-phase machine include operating the multi-phase machine in a first configuration with a first number of poles, where the first number of poles is based on a first number of phases in the first configuration and a number of stator slots allocated for each winding in the multi-phase machine. The method and system also include receiving a signal indicating the pole switching operation in the multi-phase machine. In response to receiving the signal, the method and system include operating the multi-phase machine in a second configuration with a second number of poles, where the second number of poles is based on a second number of phases in the second configuration and the number of stator slots allocated for each winding in the multi-phase machine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CUMMINS INC500 JACKSON STREET COLUMBUS IN 47201

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arafat, Akm Blaine, US 18 7
Palmer, Bradford K O Ham Lake, US 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 7, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00