Process for making a connecting element for the friction-increasing connection of components, and use of a connecting element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11976679
APP PUB NO 20240035499A1
SERIAL NO

18257120

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Arrays having a support structure and a plurality of connecting elements are described. Each connecting element is associated with at least one holding arm integrally linking the connecting element to at least one of (a) the support structure and (b) one or more of the other connecting elements. The connecting element of these arrays include a metal substrate having joining surfaces on opposite sides, where each joining surface has hard particles fixed on the metal substrate by a binder layer. Processes for producing such arrays and using the connecting elements are also described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
3M INNOVATIVE PROPERTIES COMPANYP O BOX 33427 ST PAUL MN 55133-3427

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grimm, Florian T Kempten, DE 6 2
Kaufenstein, Werner Kempten, DE 1 0
Peterhansl, Volker Langenargen, DE 2 0
Rudolph, Roman Kempten, DE 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 7, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00