Method of manufacturing substrate structure with filling material formed in concave portion

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11973014
SERIAL NO

16690801

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a substrate structure including a substrate body, electrical contact pads and an insulating protection layer disposed on the substrate body, wherein the insulating protection layer has openings exposing the electrical contact pads, and at least one of the electrical contact pads has at least a concave portion filled with a filling material to prevent solder material from permeating along surfaces of the insulating protection layer and the electric contact pads, thereby eliminating the phenomenon of solder extrusion. Thus, bridging in the substrate structure can be eliminated even when the bump pitch between two adjacent electrical contact pads is small. As a result, short circuits can be prevented, and production yield can be increased.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SILICONWARE PRECISION INDUSTRIES CO LTDNO 123 SEC 3 DAFENG RD TANZI DIST TAICHUNG CITY 427

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Fu-Tang Taichung, TW 33 147
Lin, Chang-Fu Taichung, TW 88 467
Lin, Chun-Tang Taichung, TW 47 134
Yao, Chin-Tsai Taichung, TW 21 105

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 30, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 30, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 30, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00