Leak diagnosis method and leak diagnosis device for blowby gas treatment device of internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11971327
APP PUB NO 20220276113A1
SERIAL NO

17632328

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A blowby gas treatment device includes a pressure control valve, a fresh air induction pipe, a first blowby gas pipe, a second blowby gas pipe, a shutoff valve, a one-way valve, and a PCV valve. A leak diagnosis includes a first-stage diagnosis to determine whether or not falling of a pressure in a crank case after closing of the shutoff valve under a non-supercharging condition is normal. A second-stage diagnosis is implemented by using an air fuel ratio feedback control, and determining whether or not a sensed intake air quantity obtained by an air flow meter is equal to an actual intake air quantity flowing into a cylinder set. When the sensed intake air quantity is equal to the actual intake air quantity, presence of an in-system leak is determined, and when the actual intake air quantity is larger, presence of an out-of-system leak is determined.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NISSAN MOTOR CO LTD2 TAKARA-CHO KANAGAWA-KU YOKOHAMA-SHI KANAGAWA 2210023 ?2210023

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takahashi, Akihito Kanagawa, JP 32 167
Yamagata, Toshihiro Kanagawa, JP 20 228
Yamashita, Shimpei Kanagawa, JP 4 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 30, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 30, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 30, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00